Tohokudenryoku Noshirokaryoku Power Station - Noshiro

4.1/5 に基づく 7 レビュー

Contact Tohokudenryoku Noshirokaryoku Power Station

住所 :

1-6 Omoriyama, Noshiro, Akita 016-0807, Japan

電話 : 📞 +889
Postal code : 016-0807
Webサイト : https://www.tohoku-epco.co.jp/power_plant/thermal.html
Opening hours :
Saturday Open 24 hours
Sunday Open 24 hours
Monday Open 24 hours
Tuesday Open 24 hours
Wednesday Open 24 hours
Thursday Open 24 hours
Friday Open 24 hours
カテゴリ:

1-6 Omoriyama, Noshiro, Akita 016-0807, Japan
s
sky Blue on Google

9
932 kɯ̥̈sə ̃d͡zïŋwaˑ on Google

マサカズ on Google

すなお on Google

す〜き on Google

ラムネ飲みたい! on Google

21年位前かな・・まだ建設中の時、トレ―ラ-で呉のバブ日立からパイプや部材を積んで何度も来てました。 この前のゴ-ルデンウイ-クで弘前へ行く途中、自家用車の窓から見る事ができ嬉しく思いました。 今は地場のドライバ-で来る事はないですが、安全な運転を続けて下さい。
About 21 years ago ... When I was still under construction, I came many times with a trailer loading pipes and parts from Bab Hitachi in Kure. On the way to Hirosaki at the last Golden Week, I was glad to see it from the window of my car. Now that you are not a local driver, please continue to drive safely.
b
bitman au on Google

能代火力発電所は東北電力(株)の火力発電所で、能代市字大森山に所在している。 1号機は平成5(1993)年5月、2号機は平成6(1994)年12月にそれぞれ運転を開始し、現在の総出力は120万kW、27万5000ボルトで能代変電所に送電している。 現在、平成32年6月に営業運転開始を予定している能代火力発電所3号機(出力60万kW)について、経済産業省に対し電気事業法に基づく工事計画の届出を行い、新設工事を着工中です。 主燃料は石炭で、年間約270万t使用する。そのほか、近年は地球温暖化対策の一環として木質バイオマス燃料を導入し、石炭と混合・粉砕、粒状にして使用している。 敷地面積は約109万m²あり、発電所の排熱を利用した熱帯植物園を含むPR施設「能代エナジアムパーク」を併設している。
Noshiro Thermal Power Plant is a thermal power plant of Tohoku Electric Power Co., Inc., located in Omoriyama, Noshiro City. The first unit started operation in May 1993 and the second unit started operation in December 1994.Current total output is 1.2 million kW and 275,000 volts, which is transmitted to the Noshiro substation. ing. Regarding Noshiro Thermal Power Station Unit 3 (output 600,000 kW), which is scheduled to start commercial operation in June 2020, the Ministry of Economy, Trade and Industry is notified of the construction plan based on the Electricity Business Act, and new construction work is underway. Construction is underway. The main fuel is coal, which uses about 2.7 million tons a year. In addition, in recent years, woody biomass fuel has been introduced as part of measures against global warming, and is mixed with coal, crushed, and used as granules. The site area is approximately 1.09 million m², and a PR facility "Noshiro Enadium Park" that includes a tropical botanical garden that uses the waste heat of the power plant is also installed.

Write some of your reviews for the company Tohokudenryoku Noshirokaryoku Power Station

あなたのレビューは、情報を見つけて評価する際に他の顧客に非常に役立ちます

評価 *
あなたのレビュー *

(Minimum 30 characters)

あなたの名前 *