株式会社ジェネシスジャパン

4.1/5 に基づく 8 レビュー

Contact 株式会社ジェネシスジャパン

住所 :

Mitsuidai, Hachioji, 〒192-0014 Tokyo,Japan

電話 : 📞 +87
Webサイト : http://www.genesisjapan.co.jp/
カテゴリ:
街 : Tokyo

Mitsuidai, Hachioji, 〒192-0014 Tokyo,Japan
高橋貴子 on Google

丁寧な説明で安心して工事をお任せする事ができました。仕上がりも大満足です‼️
With a polite explanation, I was able to entrust the construction with peace of mind. I am very satisfied with the finish! ️
関あけみ on Google

困った所を丁寧に修繕していただけました。 細かな見えない様な所もキレイにして頂けます。営業の担当さんも工事を施工して下さった方もとても良い方でした。
I was able to carefully repair the troubled part. You can clean the details that you cannot see. The person in charge of sales and the person who did the construction work were also very good people.
片岡将 on Google

専有部の管理管理会社として利用させて頂きました。 共有部の災害被害個所の修繕を行ってもらい、ご紹介した顧客からは好評をいただいております。
I used it as a management company of the exclusive department. We have received repairs from the disaster-damaged parts of the common area and have been well received by the customers who introduced us.
真鷹 on Google

提案内容をよく聞いていただき、職人さんの技術にも大満足でした。 友人や親せきにもおすすめできると思ってます。
I was very satisfied with the craftsman's technique after listening to the proposal. I think I can recommend it to my friends and relatives.
長野隆 on Google

火災保険を利用した修繕工事をお願いしました。若い職人さんたちが一生懸命仕事してくれました。信頼出来る会社です。
I asked for repair work using fire insurance. Young craftsmen worked hard. A reliable company.
剛士南部 on Google

分かりやすいように箇条書きで説明します 1、契約書が一方的すぎる 金額が納得いかなくず、破棄しようにも保険金額の20%+支払われた保険金の20%を調査見積もり費用として支払わなければ解約できない鬼畜契約。見積もり金額よりも保険金が少なければ工事内容を一方的に減らす、工事会社が一切リスクを負わない仕様。 2,見積もりが大雑把すぎて笑うレベル 最初にもらったのは手書きの見積書、後にちゃんとした見積もりを請求したが担当不在で遅れると伝えられ10日程かかった。 この時点で保険会社に工事会社を通じて請求されていたので、保険会社に提出された見積書を送って頂いたら、保険会社の方が先に届いたから笑えた。見積もり内容は概算見積もりレベルだった。(写真有) 3、保険金額が見積もり金額の半分程だった 契約書の締結前に確認した内容は、「見積もり金額はほぼ通ります。今まで金額が大幅に下回った事はありません」半額は大幅ダウンに入らない会社なようです。なので、工事の一部は行わない説明を受けたが、その一部が何処なのか説明は一切無し。心配になったので再見積もりを頼んだが、担当不在の為10日程かかって、ただ値引き調整され半額になった見積書が届く。ウケた(写真有) 4、お金を払うと伝えたら、受け取りにだけ来た 領収書は担当が居ないので後日郵送すると伝えられ5日後届いた。 普通ありえない。これが詐欺だったら終了なレベルな扱い。 5、見積もり内容と工事内容がおかしい 減額されてるので、文句はあまり言うつもりはないのですが特に見積もりとおかしい点がありました。足場の仮設工事が明らかに平米が足りてない。普通家の外周に足場を建てる場合、建物の外周に少し足して計算いたします。10m×5m高さ6m程度の建物なら (10×2+5×2)×6=180平米 これは外周すべてに2階建て分の足場を組んだ場合の目安です。 (実際はもう少し細かく計算しますが) 見積もりの数字は大体近かったので気にしなかったですが、実際に建てられた足場はほぼ半分くらいだけでしたので、金額がまったく変わってきますよね。(帰ってきたら、予定日より早く引き上げられたので写真撮れなかった。残念です)見積もり金額の50%を占める足場工事部分をさらに半分で工事したら、かなりの金額が浮くと思いませんか?この部分にも特に説明はありませんでした。ボッタくりバーより高かったです。知らんけど。 6、契約から工事まで時間がかかり過ぎた コロナ等色々あったので、工事はいつでも良い方向で考えて進めていました。契約日(6月10日)工事完了((10月15日)完了写真はまだ届いていない。工事期間は5日間、1日目・足場設置、2日目無人、3日目・工事、4日目足場撤去 笑える。 7、工事後、屋根と庭には大量の釘が・・・ 工事前に気を付けて欲しいところは無いか聞かれたので 「子供がいるので、その辺を気を付けて下さい」と伝えたが そこら中に、釘やら交換した部品やらやりっぱなしでした。 気を付けないなら最初から聞かないで欲しい。 見積もりに、処分・清掃の項目はあったのですが、減額されたのでしょうね?(写真有) 8,まとめ あくまで今回、我が家が体験した出来事です。他の方の口コミは違うようなので、あくまでも参考までにお願いいたします。他人を信じるにも限度があることを身を持って体験する事ができました。工事を行ってしまったので、次回災害にあい保険金を請求した場合に、適用除外される部分が多々出て来ると思います。無知の勉強代の代償は大きいです。この投稿を読んだ方には同じ過ちをして欲しいと願っております。是非、ジェネシスジャパンさんをご利用なさって下さい。旅は道連れとは云うではありませんか。レビューの星は、担当の阿部さんが美人さんなので星1つ追加しました。 質問は、受け付けておりませんのでご了承ください。 11月24日現在、連絡及び完了写真、釘の撤去に来ておりません。
I will explain in bullet points for easy understanding 1. The contract is too one-sided A devil contract that cannot be canceled unless the amount is unsatisfactory and 20% of the insurance amount + 20% of the paid insurance amount is paid as the survey estimation cost even if it is to be destroyed. If the insurance money is less than the estimated amount, the construction content will be unilaterally reduced, and the construction company will not take any risk. 2, the level of laughing because the estimate is too rough The first thing I got was a handwritten quote, and later I requested a proper quote, but it took about 10 days because I was told that I would be late due to the absence of the person in charge. At this point, the insurance company was billed through the construction company, so when I sent the quote submitted to the insurance company, the insurance company arrived first, so I laughed. The content of the estimate was an approximate estimate level. (Photos available) 3. The insurance amount was about half of the estimated amount What I checked before concluding the contract was, "The estimated amount is almost the same. The amount has never fallen significantly." Half the price seems to be a company that does not fall significantly. So, I received an explanation that part of the construction will not be done, but there is no explanation as to where part of it is. I was worried, so I asked for a re-estimate, but it took about 10 days because I was not in charge, and I just received a discount-adjusted and half-price quote. Uke (with photo) 4. When I told him to pay, I just came to pick it up I was told that the receipt would be mailed at a later date because there was no person in charge, and it arrived five days later. Normally not possible. If this is a scam, it will be treated as an end level. 5. The contents of the estimate and the contents of the construction are incorrect. I'm not going to complain too much because it has been reduced, but there was something wrong with the estimate. Temporary scaffolding work is clearly lacking in square meters. When building a scaffolding on the outer circumference of an ordinary house, we will add a little to the outer circumference of the building to calculate. If the building is 10m x 5m and 6m high (10 x 2 + 5 x 2) x 6 = 180 square meters This is a guideline when a double-decker scaffold is built on the entire circumference. (Actually, it will be calculated in a little more detail) I didn't care because the estimated numbers were close to each other, but the scaffolding that was actually built was only about half, so the amount of money will change completely. (When I came back, I couldn't take a picture because it was pulled up earlier than the scheduled date. I'm sorry.) Wouldn't it be possible to get a considerable amount of money if the scaffolding work, which accounts for 50% of the estimated amount, was constructed in half? There was no particular explanation for this part either. It was higher than the botta kuri bar. I don't know. 6. It took too long from the contract to the construction There were various things such as corona, so I was always thinking about the construction in a good direction. Contract date (June 10) Construction completed ((October 15) completed photo has not arrived yet. Construction period is 5 days, 1st day, scaffolding installation, 2nd day unmanned, 3rd day, construction, 4 Day scaffolding removal Laughable. 7. After construction, there are a lot of nails on the roof and garden ... I was asked if there was anything I wanted you to be careful about before construction. I said, "I have children, so please be careful about that." All over the place, nails and replaced parts were left untouched. If you're not careful, don't ask from the beginning. There was an item for disposal / cleaning in the estimate, but was it reduced? (Photos available) 8, Summary This is just the event that my family experienced. Other people's reviews seem to be different, so please use it as a reference only. I was able to experience for myself that there is a limit to believing in others. Since the construction work has been done, I think that there will be many parts that will be exempted the next time you make a claim for insurance in the event of a disaster. The cost of studying ignorance is high. I hope those who read this post will make the same mistake. Please use Genesis Japan. Isn't the trip a companion? As for the star of the review, I added one star because Mr. Abe in charge is a beautiful woman. Please note that we do not accept questions. As of November 24th, we have not come to contact you, take a photo of the completion, or remove the nails.
C
Chika on Google

父の家で少しの雨では大丈夫なのですが、大雨が降るとサッシの付近の壁が濡れて、シミが出ていて原因が分らず困っていました。こちらの会社をネットで見て調べて調査を依頼しました。すぐに来ていただいて外壁のひび割れから雨水が染みてるとのことで、修理をお願いしました。知らずにほっておくと、家の為にも良くなかったとのことで、色々丁寧に説明して頂けました。これで雨が降っても安心です。 あれから壁が濡れることはなくなりました。感謝しています。
It's okay with a little rain at my father's house, but when it rained heavily, the walls near the sash got wet and there were stains, so I was in trouble because I couldn't figure out the cause. I looked up this company on the internet and asked for a survey. He came immediately and said that rainwater was seeping through the cracks on the outer wall, so I asked him to repair it. If I left it unknowingly, it wasn't good for my house, so I was able to explain it in various ways. Now you can rest assured that it will rain. Since then, the walls haven't got wet. I am grateful.
中國弘 on Google

最初は屋根の破損箇所のみを補修しようと思っていましたが、築25年経過しており、営業担当の方に色々アドバイスをいただき、屋根のカバー工法と外壁塗装をお願いしました。仕上がりに大変満足しています。作業にいらした方も対応も良く、こちらでお願いして良かったと思っています。ありがとうございました。
At first, I was thinking of repairing only the damaged part of the roof, but since it was 25 years old, I asked the sales staff for various advice and asked for the roof cover method and exterior wall painting. I am very satisfied with the finish. The people who came to the work were also very responsive, and I'm glad I asked for it here. Thank you very much.

Write some of your reviews for the company 株式会社ジェネシスジャパン

あなたのレビューは、情報を見つけて評価する際に他の顧客に非常に役立ちます

評価 *
あなたのレビュー *

(Minimum 30 characters)

あなたの名前 *